YASKAWA SERVO Manuel d'utilisateur Page 90

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 239
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 89
6 Program Table
6.1.7 Status Changes in Program Table Operation
6-10
(2) Resetting the Program
The program will be canceled if the /PGMRES signal becomes active while the program is stopped (when the
/PGMRES signal is on the rising edge and the /START-STOP signal is inactive.)
6.1.7 Status Changes in Program Table Operation
There are three different statuses for program table operation. The initial status is “canceled.”
The following table shows the status changes that can occur during program table operation.
Note: If the program table operation is restarted after it stopped because of an error, the PGMSTEP in which the error
occurred will be skipped and execution will be restarted from the PGMSTEP specified by NEXT. (If the operation
has not been executed for the number of times specified in the LOOP, the next LOOP will be executed.)
Operating Stopped
/PGMRES
Canceled
/START-STOP Canceled
Rising edge
Canceled
Stopped
Operating
/START-STOP
active (start)
/START-STOP inactive
/START-STOP active (restart)
Error
When NEXT
is "END"
/PGMRES
rising edge with
/START-STOP
inactive
Status /START-STOP /PGMRES Operation
Canceled
Start
(Latch specified signal
between /SEL0 and /SEL7.)
Operating
(Started or
restarted)
Stop
Stopped
Cancel
Restart
Active
Inactive
or
Active
Inactive
Active
Inactive
or
Active
Inactive
Inactive
Active
Inactive
Active
Inactive
or
Active
Inactive
Vue de la page 89
1 2 ... 85 86 87 88 89 90 91 92 93 94 95 ... 238 239

Commentaires sur ces manuels

Pas de commentaire